Bespoke reception desk produced for ‘Lightyear’ office building
We recently produced a bespoke reception desk as part of the £2.5m fit out of the ‘Lightyear’ office building, previously known as the Cirrus Building, within Glasgow Airport Business Park.
The bespoke desk, designed by c2:concepts, was manufactured using solid Poplar timbers with a black granite HI-MACS solid surface worktop and black metallic skirting. The desk features two Formica Diamond Black core bands which wrap around the front of the desk into timber profiles.
Drawer units were also installed, which were manufactured from Formica laminated mdf with HI-MACS black granite fronts.
Double sockets, USB ports, lighting, a cable tray and cable outlets were also incorporated in to the new desk which is featured within the main reception of the 3-storey office block.
Director, Gerry Cummins said, “It was great to collaborate with c2:concepts and our client Squarestone Growth to compete the manufacturing of this desk which is a focal point within the newly refurbished office space.”
Click here to view our full image gallery for this project.